Getting a call

Dr. Bakker called three days later. The heritage authority had approved a full professional excavation of the Birch Ridge site, to be conducted under his supervision with a trained team.
Advertisement
The work would take months, with every layer carefully documented before the next was touched. Then he asked whether she would like to be present.
Page 90 of 100

